Monthly Archives: March 2014

Mud System User Manual

mud system USER MANUAL Contents
I. Preface
II. Structure and characteristic
III. Main Technical Parameters
IV. Installation , Debugging and Maintenance
V. Wearing Parts
VI. Random file
I. Preface
GNZJ752-2S Mud cleaner is the 2nd and 3rd stage solids control facility ,developed, designed and manufactured by our company. it is a 3-in- 1 facility of the first class solids control facilities – shale shaker , the second one –desander , and the third one- desilter. It is reliable in working and convenient in maintenance. It is one of the ideal solids control facilities.
GNZJ752-2S 200×2 / 100×8 8 pcs of 4″Cone 2 pcs of 8″Cone
Drilling Fluid mud system for sale II. Structure and characteristic
1、 This facility is composed of four main parts: shale shaker GNPS703, desander and desilter cyclones, support bracket and base. The structure is as shown as fig.1.
2、 Characteristic
(1)The facility has adopted great amount of the latest technology of the world . It is compact in structure ,reliable in working, convenient in maintenance, and can be used in many fields. It is the assembly of a shale shaker, desilter cyclones, and a underset shale shaker. It reduces the occupation, and can convenient the on-site operation and well group-moving greatly.
(2)The shale shaker can working as a independent part together with tank 1# . While the 3 shakers working together , Desilter can be stopped while the shaker screen mesh is reaches to 200 meshes .When the screen mesh reaches to 150 , it will help for drilling mud cleaning,reducing abrasion for mud pump and drill bit ,increase the working performance.at the same time,welcome to refer to the website to buy.

gnsolidsamerica.com is a provider of professional website Mud Agitator

The Initial Startup procedure is to be used when the equipment is being started for the first time, or when equipment is returned to use after an extended period out of service. The initial startup is performed as follows:

Verify that all operators and maintenance personnel have read and understand all operating and safety information.Verify that equipment has been assembled and installed in accordance with part 2. Check oil level in gearbox. If low, fill to bottom of level plug. Jog drive motor to check that impeller rotates in the correct direction. If rotation is incorrect, shut down and lock out and tag out electric power, and reverse any two leads to switch direction of motor rotation.

Start up mud agitator in accordance with the Normal Startup procedure.To shut down the mud agitator for any reason, first shut off the mud feed and then turn off electric power to the agitator motor.To immediately stop the machine in case of emergency, open the fused disconnect supplying electric power to the machine.

Gnsolidsamerica.com is the owner of the article on Mud Agitator and  mud agitator manufacturer, pls click visit us to know more info.pls visit us http://www.gnsolidsamerica.com