Monthly Archives: April 2014

GN Solids Manage display desander as well as desander desilter

The actual Just offshore Technologies Meeting ( OVER THE COUNTER ) kept within Houstons Dependent Middle, may be the just offshore gas and oil industrys primary occasion for that improvement associated with hydrocarbon source within the regions of drilling, environment safety, pursuit, manufacturing improvement, development as well as technologies. OVER THE COUNTER had been started within 1969 and today draws in more than eighty, 000 site visitors through all over the world every year.

 

This past year, GN demonstrated shale shaker, shaker display, desander  dish within OVER THE COUNTER. These types of tools drawn numerous participants through world wide. GN created an effective display within 2012 OVER THE COUNTER. This season, GN will require decanter centrifuge as well as up and down reducing clothes dryer in order to OVER THE COUNTER. encouraged in order to GNs sales space to check out GNs Solids Manage Tools. GN obtained the fifty four m2 sales space region within OVER THE COUNTER this season.

Common data. regarding 2013 OVER THE COUNTER

(1)Show Period: 03 19-21, 2013

(2)City: Houston

(3)GN sales space Absolutely no: Industry, 9351

For those who have any kind of oppotunity to go to this particular exhibit as well as thinking about solids manage as well as drilling waste materials administration tools, Make sure you don’t wait to make contact with around.

below  Centrifuge, drilling liquid, GN Organization, GN Solids Manage, Strong Manage Gear

GN Drilling Liquid Cleansing Program

Drilling liquid cleansing systemis an essential part associated with drilling rig program. the objective of the drilling liquid cleansing program would be to take away the suspending solids entrained within the dirt. Higher Solids boost the liquid denseness that leads to a lot of difficulties. For instance, higher liquid denseness leads to stress within the development from the borehole. this particular stress hard disks the actual drilling liquid with the filtration system dessert to the development, results in extreme drilling liquid reduction towards the development, as well as stretches nicely improvement period necessary to take away the dirt in the development. Solids manage tools such as shale shaker, desander desilter  are utilized with regard to getting rid of the actual suspending solids entrained within the dirt. GN Solids Manage may be the firs API Licensed Solids Manage Tools producer within The far east. we offer drilling companies along with solids manage tools and also the total drilling liquid cleansing program. GN liquid cleansing techniques tend to be transportable; they’re skid or even truck installed, and may variety within container capability through under 500 gallons in order to more than 10000 gallons. the actual cleansing price from the device ought to be created from dirt pumps optimum circulation price. if you  want to  know more about gnsolidsamerica click here

desander-1

http://www.gnsolidsamerica.com/desander.html

mud system utilizing within essential oil & gasoline region

desilterPosted through Sophia Zhao. Desilter is actually a type of gear to split up drilling dirt following shale shaker as well as desander.Fucktion associated withdrilling mud system

Hydrocylone Desilter separators tend to be among the essential gear associated with managing the actual solids within the exercise liquid. The actual motion would be to take away the dangerous solids, market the actual exercise liquid overall performance as well as individual m solids contaminants sales with regard to more than 60 associated with solids amount. Once the fast drilling is created within the gentle development, the actual shale shaker just may get rid of big solids contaminants, however the Hydrocylone Desilter separators canremove good solids contaminants, completely advertising the actual solids manage effectiveness. Consequently, it’s particularly ideal for the actual nicely website in which the development is actually substantial difficult and also the drilling pace is actually reduced so the cuttings is extremely good within particle dimensionDesilter Specialized Guidelines is really as comes after:Additionally, GN produce desilter based on customersnecessity. Various client might have various request desilter, such as dimention. A few of the amending associated with desilter is actually availeble right here.know more contact  here

drilling mud system-1

http://www.gnsolidsamerica.com/contact.html

Get desander and solids control equipment Online

The initial startup procedure should be used when the equipment is being started for the first time, or when Solids Control has been returned to use after an extended period out of service.
1. Verify that all operators and maintenance personnel have read and understand all operating
and safety information in Section 2 – Safety DER02011 .
2. Confirm that desander has been installed in accordance with Section 3 – Installation
DER03011 .
3. Check that services and utilities are available in accordance with Section 1 – General
Information DER01311 .
4. Check that three-way valve control arm is properly connected, and confirm that control arm
and valve spool move freely. Correct any binding.
5. Check for any obstruction to atmospheric port of three-way valve. Remove obstruction, if
present.
6. Check oil level in vacuum pump by removing oil filler plug (Figure 4092-1) and checking that
the oil is at the top thread of the filler hole. Replenish if necessary, and re-install plug.
7. Remove top of liquid trap, and check that float valve closes. Correct any binding or defect.
8. Turn compressor belt wheel manually through several revolutions to confirm free movement.
9. Be sure that all operators and maintenance personnel are clear of equipment before applying
electric power to vacuum pump and centrifugal pump.

Drilling Mud Cleaner Important Notices

Where to use GN Drilling Mud Cleaner

GN Drilling Mud Cleaners are designed to separate fine solids from drilling fluids.Desander is the second phase of oilfield solids control system installed on top of the mud tank following the shale shaker.Desilter is the third phase of oilfield solids control system installed on top of the mud tank following the desander.Drilling Mud Cleaner is a combination of desander cone, desilter cone and bottom shaker with compact structure. It is called the 2nd and 3rd phase solids control equipment.

drilling mud cleaner

drilling mud cleaner

Imporant notices for Drilling Mud Cleaner

1.Read the drilling mud cleaner manual carefully before operating.

2. Lifting the drilling mud cleaner at specified lifting points! Make sure machine mounting is fastened and reliable; Tighten all the assembly bolt groups once a month!

3. Lock mud cleaner screen basket before moving; Unlock screen basket before operation.

4.Run motor at correct direction, after 8 hours, check the tightening torque of bolts (M20 Bolt: 38kgm; M22 Bolt: 56kgm;) Check if the body case are crack or cable worn out once a month.

5. Before starting, check if the mud cleaner locking wedge of screen is fixed or not, wash the screen with water before stop, clean discharge port of buffer box regularly.

6. Check the height of damping spring at right and left sides are same or not and check the sealing rubber once a month; Every 1000 Working hours ,Refill grease to the motor, Brand of lubricating grease: SKF LGHP2/18. Every 2500 Working hours refill grease to Reducer, and every year fefill grease to the screw lifting device, Brand of lubricating grease: Mobil EP2

7. Check drilling mud cleaner pressure gauge regularly

8. Clean residual around drop in desander and desilter apex regularly. replace cones and drop in apex according to wear condition.

Make the Event Unforgettable with Mud Agitator

Therefore, Mud Agitator is stable at 0.25-0.40Mpa is the necessary and sufficient conditions for a normal work of the cyclone. Try to make the sand pump outlet pressure stabilize in this scale, reducing the underflow hole diameter, the cyclone pressure will enlarge; otherwise the pressure drops.

Enlarge the underflow hole diameter will increase the proportion of solid particles in the overflow, improve the overflow productivity, but reduce grit rate. Small underflow hole is easy to be blocked. Therefore, the shaker screen is neither to be too small nor too large.

Because the centrifugal force and quality is proportional to the speed of the cuttings dryer, the heavier particles are tossed to the inner wall of the cyclone under the centrifugal force, then move down to the sand-discharge nozzle. The smaller particles, with smaller centrifugal force, cannot be tossed to the inner wall of the centrifuge, will be discharged from the overflow pipe with the upward movement of the liquid.

Gnsolidsamerica is the author of the article on cuttings dryer ,Solids Control and Mud Agitator.the website http://www.gnsolidsamerica.com/mud-agitator.html and another website http://www.gnsolidsamerica.com/desilter.html is introduce the factory of america and chinese infor.

mud agitator manufacturer STRUCTURE and MAIN PARTS refer to gnsolidsamerica

mud agitator manufacturer STRUCTURE and MAIN PARTS
Refer the drawing below to find more details of the structure.
The main parts is: main vessel, pipeline for mud and gas, structural basement, pressure gauge valves and adapters and so on.
Manhole is on the vessel, for maintaining or repairing.
SN Des. PN QTY
1 Main vessel GNZYQ1000-01 1
2 Valve 16DN250DD3 1
3 Nipple DN250DC-00 1
4 Bolts 8
5 Nipple DN100DC-00 1
6 Valve 16DN100DDB 1
7 Bolts 8
8 Elbow GNZYQ1000-02 1
9 Seal DN200PN10 1
10 Bolts 16
11 Nipple DN200DC-00 1
12 Bolts M24x300 4
13 Pressure gauge YLB100 1
Poor boy degasser structure
7) OVERALL DIAMENTION:
II、ASSEMBLE and PREPAARATION
1)Lifting, Transportation, Assembling
When lifting, keep the main vessel straight and vertical, keep slowly moving.
When transporting, it can be horizontal lying, while have to keep the two legs of the vessel supporting the other side, while one side is the base structure.
Usually the poor boy Degasser should be mounted beside the mud tank, under the basement, should be firm and strong, foundation bolt is used to keep the safety, as drawing below.
1、Poorboy degasser base 2、Foundation bolt 3、Concrete ground
When assembling, the crane lift the degasser up, slowly and straight to the concrete ground, use wire rope from three direction to keep it firm steady, ensure the main vessel vertically stand, then strength the foundation bolt.
2)Preparation before Operating
When it is well assembled, properly arrange the vent line, usually prepared by client. Connect the inlet with BOP or choke manifold. Close the dump valve, open the outlet valve and connect with the shaker or the mud tank.
3) Movement
Before move the degasser pls click to know, dissemble the pipeline first, then release the wire rope, lift from the top by crane, loose the foundation bolt. gnsolidsamerica is the author of the article,pls refer Mud Agitator to know more