Advanced Environmental Solutions for TBM and Pipe Jacking
GN Solids Control has recently completed the production and deployment of its GNTBM-320 Tunnel Boring Machine (TBM) Mud-Water Separation System for a domestic client. This system is set to redefine how slurry is managed in TBM and Pipe Jacking projects, ensuring more sustainable and efficient operations.
Streamlining Slurry Separation Processes
The GNTBM-320 is designed to tackle the complex challenge of separating slurry, which often contains sand, stones, and other solid materials, generated during TBM and Pipe Jacking activities. By efficiently transforming slurry into reusable water and manageable solid waste, the system plays a crucial role in reducing environmental impact and supporting water conservation efforts.
Optimized Design for Urban Construction Sites
Urban tunneling projects often face constraints in terms of space and efficiency. GNSC’s GNTBM-320 system addresses these challenges through its compact and optimized design, which allows for installation in confined spaces without sacrificing performance. The system’s multi-level structure ensures that it can meet the high treatment demands of urban construction sites.
With the GNTBM-320, GNSC continues to lead the way in providing innovative and environmentally responsible solutions for the construction industry.