Author Archives: mudcleaner

GN Economical Auger V-Tank

GN unique the auger V shape tank is perfect for collecting a lot of drilling cutting and rapidly delivery the cutting towards the both cutting drying equipment along with other application.GN V-shape tank removes the risk of an environment spill on the working site. V-tank auger stable convey all of the solids

Features & benefits

1. Process rates are 20~60 tons each hour (Ton/Hour) with explosion standard motor

2. Reduce the equipment footprint and customized can be obtained

3. Auger is used with abrasive material for extended operation minimizing maintenance

4. Save the money and reduce the track hoe and back hoe usage. Maximum reduce the project expenditure

5. Buffer bar is mounted between tank and auger. It effectively cuts down on the harm to gravity of solids for that screw conveyor. Additionally, it assure the auger correctly condition

6. The V tank is like standard frac tank, lowering the rig-up time and easy operation.

Cooperation with GN Vertical Cutting Dryer

GN vertical cutting dryer plays an essential role in recovery of drilling cuttings, GN V-shape tank is capable of doing collecting the drying cutting from shale shaker and subsequently transfer cutting to vertical cutting dryer for more process. Capacity of GN vertical cutting dryer is 30~50 Ton each hour. V tank auger will fit the demand.

What’s Vertical Cutting Dryer?

GN vertical cutting dryer can be used for drying oil based mud, water based mud and artificial based mud. While using centrifugal pressure and stainless screen maximum separate the solids and recovery the drilling liquids. You will find three types of screen to split up different solids including 0.25, 0.35 and 0.5mm opening size.

GN is focusing on the solids control and drilling waste management industry for several years. We’re devoted to supplying the Zero discharge solution, small footprint and economic the perception of any project. Make a connection with GN representative either recovery of drilling cutting problems or drilling cutting delivery issues.

Related Arciels:

auger V-tank

GN’s Decanter Centrifuge Completing the Commissioning in West Africa

GN’s engineer just finished the commissioning in West Africa for 4 models GNLW363 centrifuge. Aside from the centrifuge, this customer also purchased the screw feeding pump and screw conveyor from GN Solids Control.

All the majority of the nation’s inside the territory of West Africa or close to the Gulf of Guinea has wealthy oil reserves. It’s proven the oil reserves at gulf of Guinea store more than 80 billion BBL, which makes up about 10% from the world’s total reserves. In past many years, a sizable percent from the world’s oil production increase goes to Africa.

GN solids control has built connection with many oil industry clients from the West Africa nations. A few of the clients already placed to GN even repeated orders.

Programs of GN Decanter Centrifuge

GN’s decanter centrifuge can be utilized for various programs, from primary solids control system barite recovery to ultra-fine solids separation to drilling waste cuttings management, then to dewatering unit system. Barite recover always require a centrifuge with Revolutions per minute 1600 to 2000, GN includes a type of GNLW452 is particularly for solids control barite recovery. A few of the drilling companies would also equip one unit high-speed centrifuge following the GNLW452 for ultra-fine solids control separation.

GN can supply centrifuge with fixed speed control panel and VFD control panel. Much like this West Africa customer, they bought GNLW363G-VFD for their waste cuttings management. GN’s VFD control panel for centrifuge might be designed as 3 various wavelengths for primary and back drive on centrifuge, and also the third VFD is perfect for the feeding pump. Using the VFD control panel, GN’s biggest type of centrifuge GNLW553 would be utilized for dewatering centrifuge for waster base drilling liquids colloidal size contaminants separation. By utilizing VFD panel, the consumer could adjust the feeding rate and Revolutions per minute based on specified slurry material and dealing conditions. Evaluating using the fixed speed model, the VFD model includes a more wide application.

Related Arciels:

363 Decanter Centrifuge 1

The Most Popular Piling Desander GND120 and GND240

As an experienced solids control supplier, we start building desander/ desanding plant for piling projects from 2010. We learn from our own experience on fabricating HDD compact mud systems, also learn from competitors, as we always do, learn and observe all other one’s advantages and apply to our own equipment.

This GND120 & GND240 contains 1 double deck shaker GNZS705, c/w different mesh screens for the scalping and desanding deck, c/w 1 or 2 desander cones, which feed by the centrifugal pump lay on the bottom artistically; the pump also feeding the mud gun for mixing and mud transferring. The small sloppy tank, with V bottom, temporary storage for mud transferring and also well balanced for all the equipment.

For the GNZS705 shaker, recently, we are using GNZS705E, which is the updated 5th generation shaker, we keep updating on all the models, to make it more and more perfect, improving all the small details. This philosophy is same as some Japan companies; keep improvement, small step by small step. Then upto a fantastic place.

Drilling mud is needed throughout bored pile drilling operation; with same operate as oil drilling. To use the clay in a very high potency, decrease the consume of drilling fluid material and lower price of disposal of drilling fluid, desanding plant is important. GN Solids Co., Ltd is skilled manufacturer for desanding plant. GN Solids provide totally different model like GND-50, GND-120 and GND-240.

Below is a picture shared by client from piling site:

 

A link of GND120 to Singapore FYI.

http://gnsolidscontrol.com/drilling-fluids/mud-desanding-plant-for-bored-pile-drilling-rig

RFQ: As another sort of ferroconcrete pile, bored pile is employed to support high building manufacturing significant vertical hundreds. Bored pile may be a forged in situ concrete pile wherever the bored piles have to be compelled to be sew the development web site, whereas different concrete piles like spum pile and ferroconcrete sq. Pile square measure formed concrete piles. Bored pile is forged by exploitation bored pile machine that has specially designed drilling tools, bored pile oilrig and desanding plant for bored pile oilrig, it’s accustomed take away the soil and rock.

752 Desander

GN Drying Shaker System Completing Commissioning on-site

According to customer’s needs, all equipment shipped from GN factory could be first of all studying the commissioning process before the machine working. Sometimes, for that standard and individual equipment like shale shaker and mud cleaner or mud agitators, the trial test is going to be relative simple, therefore the customer could do on their own. The commissioning from the complete mud system, in order to some clients who don’t know how to operate solids control equipment, they might need GN dispatch engineer for their job site from the first time commissioning.

 

Before manufacturing the mud system, GN always asks the client to showcase their job site location and expected layout plan. Thus GN’s engineer would design the mud system according to the website area and layout. In the end the gear and hooking up parts shipped to site, the client could assemble the gear extremely fast according to design around the drawing.

 

Just like proven in below message, the mud cleaner unit is situated between 2 unit shale shakers. This isn’t an ordinary layout for drilling liquids recycling system. After fully consideration around the narrow part of the job site and convenience on hooking up the pipeline, GN’s engineering team suggested a strategy to place the cyclone unit between your shakers, the mud out of the well could be given individually into 2 unit shakers, after that it will pump towards the cyclone unit for more treatment.

 

GN’s shaker deck is locked throughout transportation, prior to the trial running, the operator need fixed the shale shaker on the top from the mud tank and unlock the deck. The vibration motor is originating from famous label Martin with explosion proof standard for thought on safety.

 

Simple structure is among the options that come with the GN’s shale shaker; the consumer can certainly master how you can operate it and perform the commissioning themselves. Concerning the control panel, GN provides electric diagram, the operator can begin and switch from the shale shaker without an excessive amount of electrical understanding.

594 Shale Shaker 1

GN Drying Shaker System

Hebei GN Solids Control is really a top manufacturer in China of solids control equipment, the first API licensed in China. Lately, GN drying shaker system has finished its commission on the website. With qualified performance, GN drying shaker system is able to perform service.

 

As every customer requires, also as GN proposes, all items shipped from GN will first of all to experience a commissioning process before put in operation. For many simple trial test, specifically for standard and single equipment for example shake shaker, mud cleaner, and sand pump, clients could perform the commission on their own house and guidance of User Manuals. While for many solids control system for oil and gas drilling, mud system for HDD, tunneling or holing, it will be likely for additional complicated to complete the commissioning which often includes adjustment of PLC control system. The second type of commissioning requires proficient understanding on solids control equipment, as well as on electrical control system, as well as sufficient encounters will also be necessary for finish the commissioning. For the reason that situation, if clients don’t know how you can operate, they require GN solids control to dispatch engineers to assist them to do commissioning the very first time and train them how you can operate the entire system.

 

Besides supplying commissioning service, to guarantee the system created by GN solve customers’ problem, GN always asks clients to supply particulars regarding their working site location and designs. And GN designers will the mud system based on the information supplied by clients. And all sorts of equipment and hooking up parts are going to be easily assembled within the site based on the layout sketches. The greater information a person provides the greater smooth it might be when you are performing the commission. What GN does is to make sure that GN mud system could satisfy customer’s needs and succeed around the working site.

703 Shale Shaker 1

GN Shipped Three Pieces Sample Shaker Screen for an Indian Customer

It’s been an acknowledged truth that China is really a manufacture realm. Knowing this, I wish to let you know another generally recognized truth that Anping County may be the manufacture realm of screens. Hebei GN Solids Control Co., Ltd is really a top output of solids control system and equipment which certainly range from the first stage treatment equipment shale shaker. For any shale shaker, its dealing with effect large is dependent on screens placed on it. The standard of screens will decides to some extent from the shale shaker’s performance. GN Solids Control is the owner of a shaker screen manufacturing factory in Asian biggest wire mesh center city. GN Solids Control Company has adopted innovative technology to fabricate a myriad of shaker screens and may supply many a types of exchangeable shaker screens for a lot of brand shale shakers.

 

Last days, GN has shipped three pieces sample shaker screens for an Indian customer. This customer has demonstrated curiosity about GN shake screens. This time around, GN carefully and seriously manufactured three pieces sample screens with this customer. Once this customer is content using the sample, the desire lay a large order for shale shaker screens.

 

An important qualifying criterion is screen mesh. Thread is woven into cloth; similarly, metal wire may also be woven to produce a metal cloth. Mesh means the amount of holes in a single inch’s length. And, the bigger the amount is, the more compact solids can be taken off out. For several years, screen mesh has evolve in competitive screen manufacturing, adding to using thin but strong cloth to enhance screen’s service existence and conductance.

 

Focused on manufacturing solids control equipment and shaker screen, Hebei GN Solids Control Co., Ltd is an ideal selection for you. website:

http://www.gnsolidsamerica.com

shaker screen2

China International Petroleum & Petrochemical Technology and Equipment Exhibition

Well known as CIPPE, China International Petroleum & Petrochemical Technology and Equipment Exhibition has rooted in the petroleum & petrochemical for 14 years. With these 14 year’s development and success, CIPPE has grown into the largest exhibition on petroleum industry. CIPPE builds and provides an international platform to in boost the integration of the world’s petroleum and petrochemical i CIPPEndustries with the focus and stress on the petroleum industry equipment, technology, and business. It is also an international and high media exposure stage for manufacturers to show their products, for buyer to evaluate and decide their purchasing plan. CIPPE 2014 ended with great success, and now we are waiting and look forward the oncoming 2015CIPPE which will be hold during 26th to 28th March.

 

Each year, CIPPE attracts exhibitors from all over the world. In the last year’s exhibition, more than 1500 exhibitors from 65 countries participate in the 14th China International Petroleum & Petrochemical Technology and Equipment Exhibition; more the 60000 professional people visited in the 3-days exhibition. Also, CIPPE set up 15 international pavilions, including USA, Germany, UK, French, Canadian, Danish, Italian, Russian etc.

 

In 2015 CIPPE, CIPPE will extend shale gas area. Since shale gas development has swept the country, and an increasing number of companies join the ranks of the shale gas development. Also CIPPE 2015 adds areas for “deep blue tech”. Since now oil and gas drilling is changing from land to the sea, from shadow sea to deep sea. What’s more, the purchasing group will be increased. CIPPE has focused on inviting purchasing group from the Middle East, the Americas, North Africa, Southeast Asia and other oil-rich region in the world to visit CIPPE. This year, more and more purchasing groups will be here.

 

GN Solids Control will take part in this exhibition like before, at that time , we will exhibit a number of new-technology products.

2

Drop of Crude Oil Price

The world in 21st century is always living under the fear of energy depletion, and energy crisis is regarded as the greatest living threat for human beings. In any book store, you could find a book with content like Using up the Last Barrel of Oil.  Under this background, recent 6 months’ continuous drop of crude oil price seems anti-mainstream. But it did happen.

We could still remember, at beginning of this year, some critics said that the world would always under the highly priced crude oil background, but of such a sudden, all world was full of cheap crude oil. That not only changed the life of people, but also changes the many economic individuals including the oil suppliers and consumers.

This happened because of economic. Although there is some unstable factors in political, like the conflict in Iraq and Syria, it plays only a small part of crude oil market. But he increase in supply caused by American Shale oil and gas pushed this drop of price. At end of November, the OPEC meeting said they will keep the supply at 3000BBL/day at this price, not to cut the supply, perhaps, in order to occupy the existing market proportion.

In this case, it is more necessary for the oil drilling and other relating industries to run at a limited budget, cause the benefit margin is thinner than before, and they still need to reach the desired production. In this way, the more economic equipments and spare parts seem more important than before.

GN Solids Control, who is the largest solids control and waste management equipment and system exporter in China, is always making all efforts to give the customers including the drilling company, drilling waste management company and other companies the most cost-effective solutions.

GN is based in China, but its producing standard is the international highest. That’s why, GN has established a branch company in USA, and shares the world market with world famous US and European suppliers. Hope in the coming year, GN will better support all customers, old and new, to get a new success in the rough year. If you want to know more about GN Solids Control, please click this link:

http://www.gnsolidsamerica.com

 

 

下载1

GN Pursuing A Top Quality

GN solids control is really a top manufacturer and designer of solids control equipment and system, drilling waste management equipment and system, in addition to mud recycling equipment and system. Luckily, GN is the first API licensed solids control company in China, and it has develop the branch office within the United States: GN Solids America that is the first and greatest solids control company from China. Besides, GN‘s items are actually serving in much more than 60 nations around the globe. After almost a decade’s development, GN has accomplished a properly-known brand: GN brand.

 

You might be curious so how exactly does it develops and strengthening in this rapid speed. Probably the most noticeable response is GN product’s top quality. GN is positive about the standard for each creating process is just consistent with API Q1 quality system. After finished, GN product is going to be strictly examined and examined by GN Creating and Monitoring Center.  In addition to this, in weeks ago, a brand new policy of a 3rd party inspection was carried out. This means the merchandise is going to be looked over by a 3rd party after examined by Creating and Monitoring Center. Generally, the 3rd party includes believe it or not than 3 persons: the one who responsible for the projects, the department manager, one in the Creating and Monitoring Center. Fortunately, I became a member of a 3rd party this Monday.

 

Certainly, we did have some defects. Though these defects won’t influence GN product’s performance, it might impress clients that GN shows no attention on particulars. Each one of these picks up fall under the lack of consideration on particulars, summarized by not cleaning cuttings after drilling holes to repair coupling cover.

 

It’s been stated that particulars will decide whether success comes or otherwise. GN has become pursuing a higher product quality with full attention on particulars. It has been mentioned that particulars will decide whether success comes or else. GN is becoming going after a greater product quality with full attention on particulars.

Related article:

http://drillwastemanagement.com/hdd-machine-for-pipeline-projects/

Solids Control System 7

Sources and Sizes of Solids in Oil and Gas Drilling

The two primary sources of solids (particles) are chemical additives and formation cuttings. Formation cuttings are contaminants that degrade the performance of the drilling fluid. If the cuttings are not removed they will be ground into smaller and smaller particles that become more difficult to remove from the drilling fluid.

 

Most formation solids can be removed by mechanical means at the surface. Small particles are more difficult to remove and have a greater effect on drilling fluid properties than large particles. The particle size of drilled solids incorporated into drilling fluid can range from 1 to 250 microns (1 micron equals 1/25, 400 of an inch of 1/1000 of a millimeter.

 

Oil muds can be diluted with base oil (or clean oil mud) and water muds can be diluted with water (or clean water mud) to keep the concentration and surface area of solids within bounds. Two approaches for dilution are:

  1. Dump and dilute continuously while drilling. This is the most expensive approach to solids control in most situations.
  2. Dump periodically and dilute while drilling. This is more cost effective than the first approach. Certain practices can be applied to make it less costly.

 

The total costs of dilution are: the cost of the water hauled to the rig, the cost of converting that water into a mud of correct density, plus the cost of disposal of the mud that was dumped. To make dilution less expensive, these practices should be followed:

  1. minimize the total volume of mud to be diluted.
  2. dump (displace) the maximum possible dirty mud before adding water and materials, and
  3. do as much dilution as possible in a single step- not a series of small dilutions. Therefore, as mud becomes more expensive, dilution becomes a less attractive option and mechanical separation should be pursued.

GN Solids Control is a leading company which is for oil & gas drilling fluid treatment, if you want to get any further information, click the following link ,you will get what you want.

http://www.gnsolidsamerica.com

Solids Control System 7